Icon alert
Free Safety Pack for ECA WA Business Members - get access to 50+ WHS templates! Learn more

Changes to service cable clearance

Technical Technical Cable Clearance 238

Western Power and Horizon Power recently released the Western Australian Service and Installations Requirements (WASIR) to replace the WA Distribution Connections Manual (WADCM).

A significant change in the WASIR is in relation to service cable vertical clearances over areas that are not normally accessible to a person, but on which a person can stand.

Previously the clearance was 0.1 metres and clearances in other directions from areas where a person could stand were also 0.1 metres. These clearances have now changed to 2 metres and 1 metre respectively. 

These changes have been made to align the document with the current version of AS/NZS 7000:2016 Overhead line design.

Sponsors